Top-down construction is essential for civil and underground engineering in crowded places and for quick use of the traffic area located above.
After the excavation support and deep foundations, the top level and surface design are completed. Only then does the actual underground construction begin, with minimal impact on the traffic above.
Reference projects of corporation.
reference search
Locations of corporation, branches.
location search
There are no current articles at the moment.
copyright © 2006 Swietelsky